Testing & Measurement

I-V Curve Measurement & Reporting

On-site measurement and reporting of real panel string performance under IEC 60891.

IEC 60891

With I-V Curve measurement, we extract current-voltage measurements of all solar panel strings on site and inspect for problems such as LID, PID, micro-cracks and degradation. These measurements also serve as a logbook, helping you see how much panels have degraded over time. This test answers the panel-related part of the question 'Why is my plant underproducing?'

I-V Curve Measurement & Reporting

Why Is It Needed?

What Can You Learn?

Real Power Performance

Learn the real power of your panels and check consistency with factory data.

LID Losses

Detect light-induced degradation (LID) losses in your panels.

PID Losses

Identify potential-induced degradation (PID) losses.

DC Cable Issues

Detect ground contact or leakage from cable cuts, rodent damage and other causes.

Bypass Diode Problems

Identify any problems with bypass diodes on your panels.

Shading

Detect shading-related problems.

Faulty Connections

Identify possible faulty connections in panel strings.

Scope

Why Is the I-V Curve Important?

Panel Efficiency

Checks whether panels operate according to manufacturer specifications.

Potential Faults

Detects performance losses from shading, soiling and temperature effects.

Production Capacity

Checks whether the inverter's MPP tracking algorithm works correctly.

Maintenance Planning

Provides key data to determine maintenance timing.

Technical Process

How Is I-V Curve Measured?

  1. 01

    Connection

    The device is connected to the solar panel and inverter.

  2. 02

    Measurement

    The device measures current and voltage at different operating points to form the I-V curve.

  3. 03

    Analysis

    The generated graph is analyzed in detail by an expert team.

  4. 04

    Reporting

    Analysis results are presented in a detailed report.

Methods & Outputs

Performance Simulation (PVSYST)

Real-Data Simulation

Simulation using recorded irradiance, panel temperature and manufacturer PAN files.

Production Comparison

Expected vs. actual production compared; losses examined.

Performance Value

Plant performance value determined and a production profile generated.

FAQ

Frequently Asked Questions

It is a measurement that analyzes the electrical performance of solar panels in detail, revealing system health and efficiency.

Generally once or twice a year is recommended; more frequent measurement may be done when performance decline is observed.

Panel efficiency, shading, soiling, temperature effects and inverter MPP tracking accuracy, among many parameters.